Sport Reflective Training Long Lead 15m - Dog Training Equipment

19.99 GBP
  • Brand: Hem and Boo
  • Seller: ePaws UK
  • Category: HEMBO
  • Availability: In stock
Where to buy

Sport Reflective Training Long Lead 15m - Dog Training Equipment Description

Dog | Recall and Distance Control Durable and Strong Reflective for Safety The Hem and Boo Sports range is made from tightly woven nylon; strong and durable with a sporty feel. They are reflective for safety for those early morning and autumnal evening walks Ideal for mastering the recall technique and for practising distance control commands Length: 15M x 25mm
Buy from ePaws UK

Review of ePaws UK

🔒 ePaws UK is a verified shop offering this product.

19.99 GBP Read full review →
Featured Shop - ePaws UK

Dog Supplies, Cat Supplies, Bird Supplies

FREE Delivery On All Orders Over £30
Visit store
More from this seller

All products from ePaws UK

Pet products from ePaws UK in one place - browse more products from the hembo category.

View all ePaws UK products
icons sprite icons sprite